Review Early and at the Gates

תוכן זה אינו זמין עדיין בשפה שלך.

Module 2 of 5 in the chapter What I Would Architect, chapter 24 of the Integration Architect course. Each module stands on its own. Previous: How I Solve an Integration Scenario · Next: The Course Is the Checklist

The question this module answers: When should an integration design be reviewed, and what should each review catch?

Ask most teams when they review an integration design and you’ll hear one answer: before go-live. When I’m asked, my answer is: yes, at design time, and also before a go-live, but that can be way too late. So also at the code review, and when entering a major QA gate.

For integration, I add one more, because the other end of every arrow keeps moving: again at every release.

An integration finding costs more than most, because an arrow has two ends. By go-live, the partner has built to your contract, tested against it and scheduled their own release around it. A change that would have been a line in the design record at week two is now a change to two systems, two test plans and two teams’ calendars.

So a review at go-live finds problems at the moment they cost the most to fix, and often the only choice left is to note them and go live anyway. The fix isn’t a bigger review at the end. It’s moving most of the review earlier, to the points where a finding is still cheap.

Each review has its own question. Asking the same checklist five times wastes everyone’s time; asking each review the right question doesn’t.

Five reviews, five questions Five reviews from top to bottom, numbered. One, at design time, in green: is this the right design? Two, at code review: does the build match the record? Three, entering a major QA gate: does it hold at real volume, and when things fail? Four, before go-live, in amber: are we ready to run it? Five, and again at every release: what changed under the arrow? Underneath: a finding costs more at every step down, and an arrow has two ends; go-live alone can be way too late. {"author": "Steve Simpson", "blueprint": "1.0.0", "builder": "standard 1.59.0", "built": "2026-11-21", "id": "DGM-INT-WA-21", "rights": "\u00a9 2026 Twinshark LLC. All rights reserved.", "template": "flow/sequence 0.1.0", "theme": "stevetecharc 1.4.0"} At design time Is this the right design? At code review Does the build match the record? Entering a major QA gate Does it hold at real volume, and when things fail? Before go-live Are we ready to run it? And again at every release What changed under the arrow? 1 2 3 4 5 A finding costs more at every step down, and an arrow has two ends. Go-live alone can be way too late. HOW TO READ IT 1 the order a step what comes next © 2026 Twinshark LLC · stevetecharc.com
Click to enlarge

Each review asks its own question. A finding costs more at every step down.

1. At design time: is this the right design?

Section titled “1. At design time: is this the right design?”

This review matters most, and it’s the cheapest. Nothing is built, and no partner has built anything either. Review the landscape and the arrow records, one line at a time: the requirement and its Number of Zeros, the pattern and the mechanism, who the call is made as, the failure plan, the owner. Use the card in module 3. Any arrow without a record isn’t designed yet.

2. At code review: does the build match the record?

Section titled “2. At code review: does the build match the record?”

Designs change quietly during the build. Nobody decides to change them; a developer makes a reasonable local choice, and the arrow moves. So at code review I read the integration code against the record:

  • No hard-coded addresses or versions. A version written into a URL is a time bomb with a retirement date (chapter 3). Endpoints and secrets live in named credentials, not in code (chapter 13).
  • A timeout that was chosen. The default isn’t a decision. The timeout should match who’s waiting (chapter 14).
  • Retries in one layer only, and every write safe to repeat, with the key the record names (chapter 14).
  • No call inside a loop, and nothing that spends the transaction’s limits one record at a time (chapter 9).
  • Nothing logged that shouldn’t be, and everything logged that the record says should be.

3. Entering a major QA gate: does it hold at real volume, and when things fail?

Section titled “3. Entering a major QA gate: does it hold at real volume, and when things fail?”

The design was right, and the code matches it. Now prove it holds, in two ways.

At real volume. Test with the volumes on the record, three years out, against the partners’ test environments, not only a mock. Small tests mislead. Salesforce says it plainly in its reliability guidance for agents, and it’s true of any integration: load testing in a Partial Copy sandbox with reduced data “provides misleading confidence.” The same page gives a rule to put in the plan: “Before running these tests, get approval from Salesforce (at least a week prior for performance test requests). Unapproved testing can be throttled or blocked” (Reliability for the Agentic Enterprise (opens in a new tab), Salesforce Architects, checked 2026-11-21).

When things fail. Make the other end fail on purpose: slow, down, wrong answer, the same message twice. Chapter 14’s lab bench is a partner that fails on purpose (chapter 14 module 9). Module 4 is the review that decides which failures to try.

4. Before go-live: are we ready to run it?

Section titled “4. Before go-live: are we ready to run it?”

By now, the design questions should be answered. If the go-live review is still finding design problems, the earlier reviews didn’t happen. This one is about operating the arrows:

  • An owner and a runbook for every arrow, tested once by someone who didn’t write it (chapter 14).
  • Alerts and reports switched on, with a normal day written down, so the morning after go-live has something to compare with (chapter 14 module 8).
  • Every credential in the inventory, with its owner and its expiry date: certificates, tokens, integration users (chapter 5).
  • How to stop each arrow, and how to bring it back, agreed with the partner and their contact for the go-live weekend.

5. And again at every release: what changed under us?

Section titled “5. And again at every release: what changed under us?”

Salesforce releases three times a year, and every partner has its own schedule. An integration that passed every review last spring can fail after the next release without a line of your code changing (chapter 14 module 9).

Here’s what that looks like with dates. Salesforce retired API versions 21.0 to 30.0 in Summer ‘25. Versions 31.0 to 40.0 are deprecated from Summer ‘27 and retired in Summer ‘28 (chapter 3, checked 2026-11-21). The SOAP API login() call retires in versions 31.0 to 64.0 in Summer ‘27 (chapter 10). Each one is a release review finding waiting to be written, for any arrow that still uses them.

So the release review asks one question of every arrow: what changed under it? A version, a sign-in, a certificate, a partner’s API, a limit. Chapter 14’s release checklist is the review.

What changes under an arrow One arrow, zoomed in: Steve Trucking's integration layer sends tonight's manifests to Salesforce, an upsert by the partner's key, marked amber; the same code and the same call as last spring. On the Salesforce side, what changes under it: the API version in the call, where versions 31.0 to 40.0 retire in Summer '28; how it signs in, where the SOAP login() call retires in Summer '27; and three releases a year, with Release Updates that each have a date. On the integration layer's side: the certificate it signs in with, which expires on a date, so whose calendar has it; and its own platform's upgrade, because the integration layer releases too. Underneath: the code didn't change; what's under the arrow did. Salesforce's dates, checked 2026-11-21. {"author": "Steve Simpson", "blueprint": "1.0.0", "builder": "standard 1.59.0", "built": "2026-11-21", "id": "DGM-INT-WA-22", "rights": "\u00a9 2026 Twinshark LLC. All rights reserved.", "template": "cells 0.5.0", "theme": "stevetecharc 1.4.0"} INTEGRATION LAYER SALESFORCE Tonight's manifests the same code as last spring starts it Upsert by the partner's key the same call as last spring The API version in the call 31.0 to 40.0 retire in Summer '28 How it signs in SOAP login() retires in Summer '27 Three releases a year Release Updates, each with a date The certificate it signs in with expires on a date: whose calendar has it? Its own platform's upgrade the integration layer releases too upserts, partner key The code didn't change. What's under the arrow did. Salesforce's dates, checked 2026-11-21. HOW TO READ IT the arrow under review, and what has a date © 2026 Twinshark LLC · stevetecharc.com
Click to enlarge

The code didn’t change. What’s under the arrow did.

None of this works as a meeting at the end. Put the five reviews in the delivery plan the way you’d put a test cycle in it: dated, with the people who attend and what they bring. The design review needs the records. The code review needs the developer and the record side by side. The QA gate needs the partner’s test environment booked and Salesforce’s approval for load testing asked for in time. The go-live review needs the runbooks. The release review needs the release notes and the inventory.

And every finding leaves the review with a severity and an owner, or it isn’t a finding, it’s a remark. Module 3 is the card that makes that happen.

The Data Architect course teaches the same idea for a data model (Review Early and at the Gates). The timing is the same. The questions are integration’s own.

Beyond the exam. The exam asks you to build resilience to system updates and to identify a solution’s constraints and trade-offs. In practice, that happens at these five points, and the release review is the one most teams forget.

  • Which reviews the project needs, and where each sits in the delivery plan, dated.
  • What each review reads: the records at design time, the code against the records, the tests at volume and under failure, the runbooks before go-live, the release notes every release.
  • The load test plan, including Salesforce’s approval asked for in time.
  • Who owns the release review, three times a year and whenever a partner releases.
  • The severity and owner of every finding, and which ones block the next gate.