ข้ามไปยังเนื้อหา

Checkpoint challenge

เนื้อหานี้ยังไม่มีในภาษาของคุณ

Original, scenario-based practice. Never modeled on actual exam questions. It’s written in the “What I Would Architect” style: the point is making your judgment visible, not picking a letter. This is the capstone of the Integration Architect course; my walkthrough comes in Checkpoint 3, so try it first.

Steve Trucking is the last-mile delivery company you’ve been designing since chapter 1. At Checkpoint 1 you drew the landscape and named a pattern for every arrow. At Checkpoint 2 you chose the mechanism for each one, gave it an identity and a failure plan, and checked the meters. Start from your own design, all of it.

This time you do three things. First, put the whole integration design on one page, now that Part 3 has added the integration layer, other orgs and agents. Second, review it the way modules 2 to 4 taught: the card, 70% at year three, and an arrow taken away. Third, read section 9 of the brief, the late changes you’ve left alone until now, and absorb them one at a time.

Read the Steve Trucking brief again, all of it, sections 1 to 9.

Everything in the brief. The ones this checkpoint leans on most:

  • R1, R2. Manifests in from three Retail Partners in three styles; status back to each in the style it wants.
  • R5 to R8, R13. The tracking link, the messages, “where’s my delivery?”, and the coordinator’s late alert.
  • R14. Delivery counts to finance every day.
  • O1, O3. Three times today’s volume within five years; a new partner onboarded in weeks, not months.
  • L1. A fourth Retail Partner. Oakline Furniture, live at three DCs in 90 days. It brings about as many deliveries as each of the other partners, about 1,100 a day. Its manifests come from its own API, which Steve Trucking calls, and its status goes back the same way. Its brand, not Steve Trucking’s, on the tracking page and the messages. Recipient personal data deleted 30 days after delivery.
  • L2. An acquisition. Gulf Coast Home Delivery: 120 trucks, about 1,200 deliveries a day, its own Salesforce org, two of the same Retail Partners. One view of each shared partner’s deliveries within a year.
  • L3. Photos and the assistant. Photos showing people kept no longer than 90 days; photos of the installed item kept for the warranty period. The Recipient assistant never promises a time dispatch hasn’t confirmed, never reveals another Recipient’s address, and never shares a partner’s order details beyond that one delivery.
  • About 3,300 deliveries a day today, eight status changes each, about four photos each at about 4 MB, growing 30% a year: about 2.2 times today in year three.
  • One Salesforce org in the US with Field Service and the partner portal; Snowflake as the warehouse and the archive; an integration layer between the partners and Salesforce.
  • Chapter 6’s “what if” for the edition: Enterprise Edition, with the event add-on Checkpoint 2 chose.
  • Everything you decided at Checkpoints 1 and 2 stands unless you can say why it changes.
  1. Solve it in order (module 1): the single big decision, then the target landscape, then every arrow on one page with its pattern, mechanism, identity, failure plan and Number of Zeros. Include what Part 3 added: the integration layer as its own box, Snowflake fed by a process, and the assistant’s one tool.
  2. Review it (modules 2 and 3): run the six areas at year three, against 70% of every shared limit. Write a review card with your three most important findings, each with a number where there is one, a severity and an owner. If your own Checkpoint 2 design breaks one of your own rules, that’s a finding.
  3. Take an arrow away (module 4): challenge I6. A Retail Partner’s API is down for two hours from 8 a.m. Walk the clock at both ends. What’s lost, what’s replayed, and who owns the recovery? Does the catch-up fit?
  4. L1, Oakline: what does a fourth partner cost your integration design in 90 days? Count the new contracts, mappings and identities. Oakline is the first partner you call rather than the one that calls you: who keeps your place in its data? Re-run the event meter with Oakline at year three. And where must the 30-day deletion reach, arrow by arrow?
  5. L2, Gulf Coast: one view within a year. Connect the orgs, integrate into the warehouse, unify, or consolidate? Which arrow carries Gulf Coast’s deliveries, as whom, and against whose allocation? What key lets Redrock’s deliveries from two carriers sit side by side?
  6. L3, photos and the assistant: how does a photo’s retention rule travel with it from the crew’s app to the photo store, and what happens to Salesforce’s link when the photo is deleted? For the assistant, what does its one tool return, and what can it never return?
  7. Then re-run. For each late change, which earlier decisions held, and which did you change? Write each changed decision as both options, then your choice: “in my professional opinion…”

My walkthrough is Checkpoint 3: Steve Trucking, the Whole Integration Design. Compare your reasoning, not just your arrows. Where you chose differently, can you say what you’d gain and what you’d give up? There are other viable designs. The point of comparing is to understand why we chose differently.

  • LAND-1, LAND-2 (the landscape and its constraints)
  • REQ-1, REQ-4 (every flow and its volume)
  • DES-1, DES-3, DES-4 (the pattern, the trade-offs, the right API)
  • BLD-2, BLD-3, BLD-4 (outbound calls, scale, error handling)
  • MNT-2 (escalation and recovery)