Study guide
This content is not available in your language yet.
Study guide for chapter 24 of the Integration Architect course. Read the five modules first; this page helps you check what stuck.
About this study guide. It’s built only from this course’s own content and the published Salesforce exam guide’s list of objectives. It is never based on real exam questions, and it doesn’t claim to know what’s on the exam. If you’ve taken the exam, please don’t send me questions from it: the certification agreement forbids sharing them, and memorizing answers is the wrong way to become an architect anyway.
This chapter closes the course. It brings together what the exam tests across every part: reading a landscape and its requirements (LAND-1, REQ-1, REQ-4), choosing and defending each integration (DES-1, DES-3, DES-4), the limits, errors and updates that shape it (BLD-3, BLD-4, BLD-6), and what happens when it fails (MNT-1, MNT-2). So the checklist points back to where each point is taught here. The real value is in the habits, and in Checkpoint 3.
For the Exam
Section titled “For the Exam”Tick them off as you go. Each one links to where it’s taught.
Solving a scenario (LAND-1, REQ-1, DES-1, DES-3)
- I read the whole scenario before drawing anything, and read for what it doesn’t say out loud: which systems can start a call, the volumes, the legacy system. (Read to the Bottom First)
- I make the single big decision first, one org or many, and say why. (The Single Big Decision First)
- I take the arrows one at a time, each through the same questions: the requirement and its Number of Zeros, the pattern then the mechanism, who the call is made as, what happens when it fails, and a written record. (Then the Arrows, One at a Time)
- For each mechanism, I know the one detail that proves I’ve used it: the replay ID, the External ID for an upsert, the named credential, the Bulk job ID. (Concrete Words, Not Buzzwords)
- I can name the trade-offs, limitations and constraints of a design, and choose a viable option with its weaker parts chosen on purpose. (Balance It, Review It, Then the Curveball)
Reviewing at the right moments (BLD-6, MNT-1, DES-3)
- I know the five reviews and each one’s question: design (right design?), code review (does the build match the record?), a major QA gate (does it hold at volume and when things fail?), go-live (ready to run it?), every release (what changed under us?). (Five Reviews, Five Questions)
- I test at the volumes on the record, three years out, ask Salesforce’s approval for performance tests in advance, and make the other end fail on purpose. (Entering a major QA gate)
- I build resilience to system updates: no hard-coded versions, and a release review of every arrow for retiring API versions and sign-ins. (And again at every release)
The review card (DES-3, REQ-4, BLD-3)
- I review by six areas: volume and limits, pattern and contract, identity and keys, failure and recovery, operations and cost, across boundaries. (Six Areas)
- I know the shared limits every arrow spends from, API calls and event deliveries in 24 hours, and keep within 70% at year three: at 30% growth, that’s about a third of the limit today. (Leave Headroom)
- Every finding has a fact, a severity and an owner. (The Integration Review Card)
Taking an arrow away (BLD-4, MNT-2, DES-3)
- I pick the arrows where a failure hurts most: the busiest, the one a person waits on, the one with no undo, a partner’s, one crossing to another org or an agent, and any that shares something. (Pick the Arrows That Matter)
- I walk the clock: the first call, an hour, a day, a weekend, and past the 72-hour event window. (Walk the Clock)
- I know error handling sits on both ends: the client owns the connection and the retry; the server notices bad data and repeated attempts. (Both Ends)
- I plan recovery too: what got through, which recovery at which size, whether the catch-up fits the shared allocations, and the newest change winning. (Coming Back Is a Failure Too)
Checkpoint 3 (DES-1, DES-3, DES-4, BLD-3, BLD-4, MNT-2)
- For each integration, I can name the pattern, the mechanism and why, how it authenticates, how it fails, and the limit it’s closest to, added up across the org. (Every Arrow on One Page)
- When we call a partner’s API, I know we keep our place in its data. (L1: A Fourth Partner You Call)
- When a second org arrives, I ask what the requirement really needs, and whose allocation the new arrow spends. (L2: Gulf Coast)
Beyond the Exam
Section titled “Beyond the Exam”The exam is the floor, not the ceiling. These are the habits from this chapter that an architect needs, whether or not a question ever asks about them.
- Blend the requirement with the solution when you speak: not “an Apex callout”, but why, which kind, with what timeout and what fallback.
- Put the five reviews in the delivery plan, dated, with who attends and what they bring.
- Review the design, not the designer. Ask before you conclude, and say what’s right too.
- Agree every severity and owner in the room, and write design changes back to the arrow’s record.
- Use an AI as a second reviewer. It proposes; a person checks every finding and puts their name in the owner column.
- Absorb a late change one arrow at a time. A design built arrow by arrow, written down, changes one arrow, not the design.
Words to Know
Section titled “Words to Know”| Term | In one line |
|---|---|
| The single big decision | One org or many, made first |
| Arrow record | One written record per integration: requirement, mechanism, identity, failure plan, owner |
| Number of Zeros | The order of magnitude of a volume, today and three years out |
| Five reviews | Design, code review, a major QA gate, go-live, every release |
| Review card | One row per finding: area, question, finding, severity, owner |
| 70% at year three | Stay within 70% of a limit against the three-year projection |
| Shared allocation | A limit every arrow spends from: API calls, event deliveries |
| Failure review | Take one arrow away and walk what happens next |
| Walk the clock | A minute, an hour, a day, a weekend, past the window |
| Viable solution | One of the few designs that work, with its trade-offs said out loud |
Check Yourself
Section titled “Check Yourself”Short scenarios in the style of the course. Decide your answer before you open it.
1. On page two, a scenario describes a partner integration. On page eleven, the company is acquiring another with its own org. When do you design the partner integration?
After you’ve read to the bottom. Late details change early arrows; read the whole scenario first, make the single big decision, then take the arrows one at a time. Reread Read to the Bottom First.
2. In a review, someone says: "We'll publish a platform event, fire and forget." What do you ask, and what answer are you listening for?
What happens when the subscriber goes down and comes back. The answer: it stores the last replay ID it processed and sends it when it reconnects, within the 72-hour window. Reread Concrete Words, Not Buzzwords.
3. The go-live review keeps finding design problems. What does that tell you?
The earlier reviews didn’t happen, or didn’t ask their questions. The go-live review should be about running the arrows: owners, runbooks, alerts, credentials, how to stop each arrow. Reread Before go-live.
4. An integration passed every review last spring. After the next release it fails, with no code changed. Which review should have caught it?
The release review: what changed under the arrow? A retiring API version, a sign-in, a certificate, a partner’s API, a limit. Reread And again at every release.
5. An Enterprise Edition org delivers 13,000 events a day today, growing 30% a year. Is it within your rule?
No. Year three is about 2.2 times today, about 28,600, over the 25,000 default allocation. To be at 70% at year three, today should be about a third of the limit, around 8,000. Put the add-on or a design change on the card. Reread Leave Headroom.
6. A finding reads: "Security could be tighter." What's missing?
A fact, a severity and an owner. “Three partner arrows sign in as one integration user; fix with a date; Salesforce admin” is a finding. Reread The Integration Review Card.
7. A change event subscriber is down from Friday evening to Tuesday morning. Walk the clock. Where does it run out?
Past the 72-hour window: the oldest events are gone, with no error. The design needs a plan for that point, such as a catch-up from the source, and the catch-up has to fit the shared allocations. Reread Walk the Clock and Coming Back Is a Failure Too.
8. A new partner's manifests come from its own API, which you call. What's different from partners that call you?
You keep your place in their data: ask for what changed since the last point, and store that point only after a page is loaded, so an outage misses nothing. The mapping lives in the integration layer. Reread L1: A Fourth Partner You Call.
9. After an acquisition, leadership wants one view of shared partners' deliveries within a year. Do you consolidate the orgs?
Not for that requirement. One view isn’t one org: send the second org’s deliveries to the warehouse through the integration layer, with its own integration user, and check whose allocation it spends. Reread L2: Gulf Coast.
Explore
Section titled “Explore”- Salesforce Certified Platform Integration Architect Exam Guide (opens in a new tab), Salesforce Help (checked 2026-11-26): the official list of objectives and their weights. Always check the current version before you book the exam.
- Reliability (opens in a new tab), Salesforce Architects (checked 2026-11-26): Well-Architected’s reliability guidance, including the margin to keep under governor limits.